Projects

Vizhinjam, Kerala Consultancy services for the proposed connectivity to Vizhinjam; preparation of DPR with Tunnel from Balaramapuram to Vizhinjam and Yard at Balaramapuram.

Client: RVNL, Chennai
Location: Vizhinjam, Kerala
Cost of project: 650 Cr
Status of Consultancy work: Ongoing
  Vayor, Kucch, Gujrat Consultancy services for the pre-feasibility study of Vayor to Koteshvar Rail connectivity Project, Gujrat.

Client: BARSYL ( Hyderabad)
Location: Vayor, Kucch, Gujrat
Cost of project: Report work in progress
Status of Consultancy work: Ongoing
         
Dadri, Uttar Pradesh Consultancy services for the preparation of Detailed Project Report for Multi Modal Logistics Hub and Multi Modal Transport Hub at Greater Noida (UP) under DMICDC project.

Client: BARSYL ( Hyderabad)
Location: Dadri, Uttar Pradesh
Cost of project: DPR work in progress
Status of Consultancy work: Ongoing
  Aquina, Afghanisthan Railway expert for the Techno – Economic feasibility study for the development of Dry port at Aquina, Afghanistan.

Client: MIR Consultants , Kochi
Location: Aquina, Afghanisthan
Cost of project: $140 million
Status of Consultancy work: Ongoing
         
Sarguja Rail Project, Chhattisgarh Lenders Independent Engineer to IDBI for the Sarguja Rail Project, Chhattisgarh- Team leader and Civil Engineering expert.

Client: Railway consultant to BARSYL (Main Client : IDBI, Mumbai)
Location: Sarguja District, Chhattisgarh
Cost of project: 1500 Crores
Status of Consultancy work: Ongoing
  RITES Ltd, Project office, Chennai Preparation of GAD, Design and structural drawings for the proposed Bridges for IPRVCL works at VOC port, Tuticorin, Tamil Nadu including PROOF checking at IIT, Chennai.

Client: RITES Ltd, Project office, Chennai
Location: Tuticorin Port, Tamil Nadu
Cost of project: 9.00 Crore
Status of Consultancy work: Ongoing
         
Project Management Consultancy (PMC) services to INFO PARK (a Govt. of Kerala Enterprise), Kakkanad, Kochi, Kerala. The works include preparation of Design and drawings, tender schedule, tendering and awarding the works and supervision of the awarded works.

Client: INFO PARK, Kerala
Location: Kakkanadu, Ernakulam, Kerala
Cost of project: 5.00 Crores
Status of Consultancy work: Completed
  Preliminary study and preparation of Feasibility Report (FR) for the Full gantry length Tank wagon loading Railway siding at Bharath Petroleum Corporation limited, Irugur, Coimbatore, Tamil Nadu as a sub consultant to BARSYL Ltd. The works included surveying the Railway yard and BPCL area, preparation of track siding alignment, abstract estimate and submission of feasibility report.

Client: Railway consultant to BARSYL, Hyderabad (Main client BPCL, New Delhi)
Location: Irugur, Coimbatore, Tamil Nadu
Cost of project: 8.72 Crores
Status of Consultancy work: Completed
         
Technical Feasibility Study for Rapid Rail Transit System (RRTS) between Thiruvananthapuram and Chengannur. Total Kms 125.56 with 27 stations, 79 Level crossings and Yard remodelling at Major stations of Thiruvananthapuram, Kollam, Nemom, Mavelikara and Kochuveli.

Client: Railway consultant to BARSYL, Hyderabad (Main client MRVC, Mumbai)
Location: Thiruvananthapuram, Kerala
Cost of project: 3500.00 Crores
Status of Consultancy work: Completed
  Detailed Design Consultancy (DDC) for construction of a new Single line BG Railway Line project from Sivok to Rangpo, W Bengal, India by IRCON. Scope of work is to be the Railway expert for the Track, Bridges and Yard of this project to the main consultants D2 CONSULT International (Austria) and PEMS consultants, New Delhi (Joint venture).

Client: Railway consultant to D2- PEMS JV, New Delhi( Main client IRCON, New Delhi)
Location: Siliguri, West Bengal , India
Cost of project: 120.00 Crores
Status of Consultancy work: Completed
         
Project consultancy services for Bankability study of Tiruvallur- Aarakkonam 4th Line in Southern Railway. The scope of work includes exploring the financial and feasibility of the 4th line based on traffic study and financial appraisal and also preparation of a business plan for the project line.

Client: Railway consultant to BARSYL, Hyderabad (Main client RVNL, New Delhi)
Location: Chennai, Tamil Nadu
Cost of project: 226.35 Crores
Status of Consultancy work: Completed
  Preparation of Detailed project report (DPR) including survey, alignment, preparation of GAD for Bridges, ROBs, RUBs and Tunnels for the Rail connectivity from Nemom station to the Proposed VIZHINJAM international Sea port, Thiruvananthapuram. Total length of connectivity is 17.05 km with yards at Nemom and Vizhinjam and a Y connection to the Balaramapuram station.

Client: RVNL, Chennai
Location: Vizhinjam, Kerala
Cost of project: 486.35 Crores
Status of Consultancy work: Completed
         
Preparation of Detailed project report (DPR) including survey, alignment design, GAD and estimate for the Rail connectivity to the new PORT at Vizhinjam, Kerala. Total length of connectivity is 15.56 Km and the work includes track design, Preliminary design of 11 bridges and 2 yards and remodelling of 2 stations.

Client: RVNL, New Delhi
Location: VIZHINJAM , Kerala
Cost of project: 352.22 Crores
Status of Consultancy work: Completed
  Preparation of Detailed project report for identification and feasibility of a Multi Modal Logistics park (MMLP) at JNPT, Navi Mumbai for Dedicated Freight Corridor Corporation of India Ltd (DFCC). The scope was to do the Railway portion of the above work for the main consultants M/s MIR consultants, Kochi, Kerala. Work included the design of a Railway yard at the proposed MMLP, entry and exit to the existing Railway network among others in consultation with the main clients DFCC.

Client: Railway consultant to MIR CONSULTANTS, Kochi ( Main client DFCC, New Delhi)
Location: JNPT, Navi Mumbai, Maharashtra
Cost of project: 650.33 Crores ( for MMLP)
Status of Consultancy work: Completed
         
Preliminary study and preparation of Feasibility Report (FR) for the Full gantry length Tank wagon loading Railway siding at Bharath Petroleum Corporation limited, Irumpanam, Ernakulam, Kerala as a subconsultant to BARSYL Ltd. The works included surveying the Railway yard and BPCL area, preparation of track siding alignment, abstract estimate and submission of feasibility report.

Client: Railway consultant to BARSYL, Hyderabad (Main client BPCL, New Delhi)
Location: Irumpanam, Ernakulam, Kerala
Cost of project: 8.62 Crores
Status of Consultancy work: Completed
  Preliminary survey and preparation of Feasibility Report (FR) for connecting the Nemom station to Vizhinjam Port, Trivandrum, Kerala. The works include preparation of track alignment, GAD of 3 bridges and Nemom yard among others.

Client: RVNL, New Delhi
Location: VIZHINJAM, Kerala
Cost of project: 328.00 Crores
Status of Consultancy work: Completed
         
Under the proprietorship firm M/s GKG Consultancy Services, did the reconnaissance survey for Cochin Port Trust for the Rail connectivity work to their newly planned Container terminal. Was Project Management Consultant for Rail Vikas Nigam Limited (RVNL) from April 2007 to Feb 2010 for their Rail connectivity work to Vallarpadam International Container Transshipment Terminal, which also had the longest Railway Bridge in India (4.62 Km).

Client: RVNL, New Delhi
Location: ICTT Vallarpadam, Ernakulam, Kerala
Cost of project: 376.00 Crores
Status of Consultancy work: Completed